Interface · Installation times

Bürgerle installation times in your calculation

You get the installation times from Bürgerle – as a DATANORM file for your wholesaler's range. KraftHub imports them at that supplier, matches every time to your catalogue by article number and prices it with your labour rate – in quotes and in tenders.

Official partnership

Bürgerle Montagezeiten

KraftHub is the first AI software in an official partnership with Bürgerle Montagezeiten.

montagezeiten.de

How the Bürgerle time becomes your installation time

Two factors fit the time to your business: one per wholesaler, one per project. Every project can deviate from the project factor.

Bürgerle time

12 min

Supplier factor

1.1

Project factor

1.5refurbishment

Installation time

19.8 min

at €58.00 per hour ≈ €19.14 labour

What you need

  • A KraftHub account with access to the settings
  • The installation-time file from Bürgerle for your wholesaler's range (ZIP or DATANORM.950 / .999)
  • Your wholesaler as a supplier in KraftHub
  • A labour article in hours or minutes
  • Recommended: the same wholesaler's DATANORM catalogue

Installation times for your range

Bürgerle's shop sells installation times for the ranges of manufacturers and wholesalers – among them these:

Go to the Bürgerle shop
  • Buderus
  • Junkers Bosch
  • GC Gruppe
  • Pietsch Gruppe

Guide

Imported in five steps

1

Open the import at the supplier

  1. Open “Einstellungen” (Settings) and choose the “Lieferanten” (Suppliers) tab.
  2. If your wholesaler is missing, add it with “Neuen Lieferanten hinzufügen”.
  3. Click “DATANORM Import” at the supplier. The import opens in a new tab with the supplier already selected.
Settings, Suppliers tab: Beispiel-Großhandel GmbH with the buttons Bearbeiten and DATANORM Import, above it Neuen Lieferanten hinzufügen.
Einstellungen → Lieferanten (sample data)
2

Drop the installation-time file

  1. Drag the file from Bürgerle into the field under “Einlesen und vorbereiten” or click “Dateien auswählen”. No need to unzip or rename anything.
  2. KraftHub recognises from the content that these are installation times. The title then changes to “Montagezeiten-Import”.
DATANORM import, step Einlesen und vorbereiten: drop zone for DATANORM files or installation times (.950) with the button Dateien auswählen.
DATANORM Import → Einlesen und vorbereiten
3

Upload and activate

  1. Check the overview: wholesaler and delivery date are in the heading.
  2. Under “Montagezeiten hochladen”, click “Datei verarbeiten” (it then reads “Verarbeitet”).
  3. Click “Montagezeiten übernehmen”. The message “Montagezeiten aktiviert.” confirms the import. Keep the page open until then.
Sätze gelesen
– all time records in the file
Zeiten gespeichert
– valid times KraftHub takes over
Verworfen
– faulty records, with the reason below
Artikeln zugeordnet
– times with an article in your catalogue
Installation-time import: delivery Beispiel-Großhandel 06.2026 with 40,172 stored times from 40,180 records read, 8 discarded; the first two steps done, the third ready with the button Montagezeiten übernehmen.
The recognised delivery just before activating (sample data)
4

Set the labour article and factors

  1. Settings → Kalkulation: choose your labour in hours or minutes under “Lohnartikel”. Without a labour article you see the times, but without a price.
  2. Below, under “Montagezeiten”, enter the “Faktor Bauvorhaben”, e.g. 1.5 for refurbishment or 0.9 for new build. Every project can deviate from it.
  3. Settings → Lieferanten: after the import, the wholesaler shows its “Montagezeiten-Faktor”. 1.10 means its times are 10% too tight for you.
Settings, Kalkulation: labour article Monteurstunde at €58.00 per hour and project factor 1.5; below, the installation-time factor 1.10 at Beispiel-Großhandel.
Top: Einstellungen → Kalkulation · bottom: Einstellungen → Lieferanten (sample data)
5

Use the installation times in a quote

  1. Open an item in the quote and add one of the wholesaler's articles in its “Kalkulation”.
  2. KraftHub asks “Montagezeit übernehmen?” and shows how the time is made up.
  3. “Montagezeit übernehmen” brings the time with labour into the calculation, “Nur Material” only the article.

If you change the minutes by hand, your time stays; “Zeit zurücksetzen” brings back the wholesaler's time. An installation time stored on the article itself takes precedence over the wholesaler's – in tenders (GAEB) too.

Dialog Montagezeit übernehmen: an installation time is stored for a radiator thermostatic valve DN 15, 12 min × 1.1 supplier × 1.5 project = 19.8 min, with the buttons Nur Material and Montagezeit übernehmen.
Quote → calculation of an item (sample data)

Before and after

Without the interfaceWith KraftHub
Guess the installation time per itemBürgerle time by article number, priced with your labour rate
Add a refurbishment surcharge in your headProject factor for the business, different per project if needed
Compensate for a wholesaler's tight timesInstallation-time factor per supplier
Maintain new times by handImport the new file from Bürgerle – it replaces the previous times

Frequently asked questions about installation times

Set up installation times?

We set up the import with you – with your installation times from Bürgerle, in one appointment.

Import Bürgerle installation times | KraftHub